|
1. |
Old County Hall, Spring Gardens: first-floor
plan in 1905. Redrawn from plans in GLC-APR
(C1/03, C1/ 15, C1/18, C2/16, D/14) |
7 |
2. |
Old County Hall, Spring Gardens: site plan in
1902. Based on the Ordnance Survey of 1893 |
8 |
3. |
The County Hall site in 1905. Based on the Ordnance Survey of 1893 and plans in GLC-APR
(A2/03, A2/06) |
12 |
4. |
Suggested Plan of the Principal Floor, New
County Hall, by the Superintending Architect,
issued with the Instructions for Competitors, 1907.
Reproduced from Koch, p. 2 |
21 |
5. |
Ralph Knott's winning design for County Hall:
perspective. Reproduced from Koch, p. 9 |
24 |
6. |
Details of a design for a gateway, submitted by
Knott for the Tite Prize. Reproduced from The
Builder, 9 Feb. 1901, p. 138 |
25 |
7. |
Competition Designs for County Hall |
27 |
|
(a) Perspective by E. L. Lutyens. Reproduced
from Koch, p. 34 |
|
(b) Perspective by G. Washington Browne.
Reproduced from Koch, p. 43 |
8. |
Competition Designs for County Hall |
28–9 |
|
(a) Ground-floor plan by H. T. Hare. Reproduced
from Koch, p. 23 |
|
(b) Ground-floor plan by Jemmet & McCombie.
Reproduced from Koch, p. 65 |
|
(c) Principal-Floor plan by E. L. Lutyens. Reproduced from Koch, p. 32 |
|
(d) Principal-Floor plan by Warwick & Hall.
Reproduced from Koch, p. 88 |
9. |
Competition Designs for County Hall |
30 |
|
(a) Perspective by Hinds & Deperthes. Reproduced from Koch, p. 97 |
|
(b) Perspective by Russell & Edwin Cooper.
Reproduced from Koch, p. 83 |
10. |
Competition Design for County Hall: perspective
by Lanchester & Rickards. Reproduced from The
Builder, 18 Jan. 1908, between pp. 70–1 |
32 |
11. |
Competition Design for County Hall: plans by
Salmon, Son & Gillespie of Glasgow, 1907.
Redrawn from plans in The British Architect, 25
Oct. 1907, pp. 194–5 |
33 |
12. |
Competition Design for County Hall: elevations
by Nicholson & Corlette. Reproduced from Koch,
p. 38 |
34 |
13. |
Knott's winning design for County Hall:
Ground- and Principal-Floor plans. Reproduced
from Koch, p. 9 |
36 |
14. |
Knott's winning design for County Hall: eastwest section through Council Chamber. Reproduced from Koch, p. 10 |
37 |
15. |
Postcard sent by Julian Leathart to Knott's office,
1911. Reproduced from original in possession of
Leathart's son
|
39 |
16. |
Knott's winning design for County Hall: east and
west elevations. Reproduced from Koch, p. 10 |
40 |
17. |
Competitions Designs for County Hall
Knott's winning design: elevation to Westminster
Bridge Road. Reproduced from Koch, p. 10
H. T. Hare's design: elevation to Westminster
Bridge Road. Reproduced from Koch, p. 24 |
43 |
18. |
The development of the plan of County Hall,
1908–9 |
44 |
|
(a) Knott's winning design plan, January 1908.
Based on Koch, p. 9 |
|
(b) The amended plan approved in July 1908.
Based on Wyllie's elevation (see Plate 5a) and
material in GLRO, AR/CB/2/124 |
|
(c) The 'waisted' plan, September 1908. Based
on a sketch in GLRO, AR/CB/2/125 |
|
(d) Knott's 'fan-shaped' plan, January 1909.
Based on material in GLRO, AR/CB/2/84 |
19. |
The development of the plan of County Hall,
1909–10 |
46 |
|
(a) Assessors' plan, March 1909. Redrawn from a
plan in GLRO, AR/CB/2/125 |
|
(b) Knott's published plan of 1910. Redrawn from
The Building News, 6 May 1910, p. 622 |
20. |
Perspective sketch of C. H. Reilly's competition
design for County Hall, May 1907. Reproduced
from original drawing in possession of C. H. Reilly's
family
|
47 |
21. |
Plan of County Hall buildings, showing relationship to existing properties in 1893. Based on the
Ordnance Survey of 1893 |
50 |
22. |
Plan of County Hall showing division into Blocks
and Sections for construction purposes. Based on
plans in GLC-APR (AC11/00, A1/05) |
52 |
23. |
Competition Design for County Hall by Matthew
J. Dawson: detail of river front. Reproduced from
Koch, p. 63 |
58 |
24. |
Knott's winning design: detail of river-front pavilion. Reproduced from Koch, p. 11 |
60 |
25. |
Drawings for panelling and fireplaces for Committee Rooms on the Principal Floor (Block 12),
1914 and 1920. Reproduced from working drawings
in GLC-APR (CD2/03, CD2/06) |
61 |
26. |
Detail drawings for metalwork, 1922. Reproduced
from working drawing in GLC-APR (AD46/08) |
62 |
27. |
Revised detail of river-front pavilions, 1912.
Reproduced from working drawing in GLC-APR
(AD22/01) |
64 |
28. |
Entrance Hall, Belvedere Road, design for north
wall, 1913. Reproduced from a working drawing in
GLC-APR (AD4/02) |
67 |
29. |
The flèche as designed in 1914 and as modified
in 1921. Redrawn from drawings in GLC-APR
(AD23/01–02) |
72 |
30. |
Section through the Members' Courtyard and
Carriage Drive. Redrawn from a drawing in GLC-APR (C2/03) |
74 |
31. |
The Council Chamber, section looking west.
Redrawn from drawings in GLC-APR (AD2/01–
03, AD36/10, AC9/05) |
78 |
32. |
Plans of the Council Chamber. Redrawn from
plans in GLC-APR (AD1/03–04) |
79 |
33. |
Members' Library: Reproduced from a working
drawing in GLC-APR (BD/01) |
82 |
34. |
London County Council Book Plate, 1903.
Reproduced from an original in possession of the
Greater London Record Office
|
83 |
35. |
Main Committee Room – Rooms 128, 129, 130
(a) Section looking north. Based on drawings in
GLC-APR (AD6/02, AC7/08) and survey
|
84 |
(b) Section looking south. Based on a drawing in
GLC-APR (AD6/02) and survey |
84 |
(c) Plans. Based on plans in GLC-APR (AD6/01,
AD51/05) and survey
|
85 |
36. |
Main Committee Room |
86 |
|
(a) Section through Room 130. Based on drawings
in GLC-APR (AD6/02, AC9/05) and survey
|
|
(b) Section through Room 129. Based on a drawing in GLC-APR (AD6/02) and survey
|
86 |
37. |
Typical panelling for a senior officer's room on
the Principal Floor, 1920. Reproduced from a
working drawing in GLC-APR (BD2/07) |
88 |
38. |
Drawing for the Cashier's Office, ground floor,
July 1913. Reproduced from a working drawing in
GLC-APR (BD4/05) |
89 |
39. |
Seating for Members in the Council Chamber.
Based on drawings in GLC-APR (AD31/01,
AD33/06) and survey
|
91 |
40. |
Northern Front (Section D), north-south section
as built. Redrawn from a drawing in GLC-APR
(DC5/08) |
94 |
41. |
North façade of County Hall. Redrawn from
drawings in GLC-APR (DD11/01, 04, 07) and
from photogrammetric survey
|
96 |
42. |
Isometric projection of the 'Drum' in Section
D. Constructed from various plans and sections in
GLC-APR (see folded drawing A, plus DD41/01–
04) and from survey
|
98 |
43. |
Designs for fireplaces for Committee Rooms in
Section D. Reproduced from working drawings in
GLC-APR (DD25/03, 06) |
99 |
44. |
Design for panelling and fireplace in Room 142,
1931. Reproduced from a working drawing in GLC-APR (DD2/21) |
100 |
45. |
Conference Hall: drawing for a plaster capital, 11
January 1932. Reproduced from a working drawing
in GLC-APR (DD52/05) |
101 |
46. |
Education Library: plan at entrance level. Redrawn from plans in GLC-APR (DD31/09,
DD46/02,08) |
102 |
47. |
Education Library: plan of glazing in skylight.
Based on a plan in GLC-APR (DD52/02) and
photogrammetric survey
|
102 |
48. |
The New County Offices (North and South
Blocks): outline plans showing alternative proposals, 1930–1. Redrawn from sketch plans in
GLRO, AR/CB/2/181 |
104 |
49. |
The New County Offices (North and South
Blocks): ground-floor plan as approved in 1936.
Redrawn from a plan in GLC-APR (AC1/02) |
107 |
50. |
Outline plan of North and South Blocks as built,
1936–1963. Redrawn from plans in GLC-APR
(G/3441/2, G/5588/22, AC11/03) |
112 |
51. |
The site of County Hall in 1986 showing phases
of development. Based on the Ordnance Survey
revision of 1963 |
115 |
Sketches |
|
Sketch of the base of one of the bronze lamp-standards on the Ceremonial Stairs |
48 |
|
Sketch of clock in the Main Entrance Hall, Belvedere
Road |
56 |
|
Detail of radiator in the Members' Entrance |
69 |
|
Sketch of the bronze-and-iron gates in the Main
Entrance Hall, Belvedere Road |
109 |
|
Folded Drawings |
|
Folded drawing A – Plans of County Hall
(between pages 62 and 63) |
I. |
Typical office floor (fourth floor) as completed, 1922–
33. Redrawn from plans in GLC-APR (AC2/05,
BC2/06, CC2/05, DC11/07, DC13/04, C5/07) |
II. |
Ground floor as completed, 1922–33. Redrawn from
plans in GLC-APR (AC1/05, BC1/05, CC1/06,
DC1/04, DC4/02–04, DC11/03, C5/03, C6/02) |
III. |
Principal Floor as completed, 1922–33. Redrawn from
plans in GLC-APR (AC1/07, BC1/08, CC1/07,
DC4/05, DC11/04, C1/01, C4/04) |
|
Overlay. Principal Floor, northern section, as originally
planned, 1912 |
|
Folded drawing B – Elevations and Section
(between pages 110 and 111) |
I. |
Elevation to the River Thames as originally built,
1922–33. Redrawn from drawings in GLC-APR
(AC8/03, C2/02, AD22/01, 04, AC11/12) |
II. |
Section, looking north through the Crescent and
Council Chamber. Redrawn from drawings in GLC-APR (AC7/04, AC11/13, AD4/05, AD11/02,
AD21/01, AD23/02, AD23/03–04) |
III. |
Elevation to Belvedere Road, central section.
Redrawn from a drawing in GLC-APR (AC7/02) |